When the house is delivered to the site it is typically
about 90 percent complete. Some finish work must be completed
before the client can move in. These tasks are generally handled by
the client or a subcontractor hired by the client.


construction of foundation and basement on-site
The on-site finish work includes:
-
Patch the roofing material across
modular stitch lines.
-
Insulate openings at mating walls,
interior and exterior.
-
Install final siding and trim across
stitch lines.
-
Connect electrical lines across
modules in junction boxes provided, and connect to main service.
-
Install any lighting fixtures that
were not installed at the production facility.
-
Connect plumbing waste, vents, water,
and gas lines across modules and connect to main service lines.
-
Patch drywall across areas left open
for plumbing and electrical access.
-
Complete all interior trim across
stitch lines.
-
Adjust interior doors as needed.
-
Install floor covering where needed.
-
Touch-up paint throughout entire
house.
-
Final cleaning of all interior
surfaces.
-
Walk-through and final inspection with
homeowner.
Other site work may include:
-
Construction of any decks, patios,
porches, and garages.
-
Final site grading, flatwork, and
landscaping.


construction of deck and landscaping